The joint maintenance depot of Shenzhen Metro Line 9 has a roof area of 31,000 m² and uses 1,000 tonnes of steel.
Large-Span Space Steel Structure
Shenzhen Metro Line 9 Joint Maintenance Depot
Roof area 31,000 m², 1,000 tons of steel.

Project overview & structural features
Project gallery
Exteriors, structures and construction records






