CN

Large-Span Space Steel Structure

Shenzhen Metro Line 9 Joint Maintenance Depot

Roof area 31,000 m², 1,000 tons of steel.

Shenzhen Metro Line 9 Joint Maintenance Depot — project image 1
Project archive photo; may include renderings.

Project overview & structural features

The joint maintenance depot of Shenzhen Metro Line 9 has a roof area of 31,000 m² and uses 1,000 tonnes of steel.